Tulkubash

The Company’s near-term focus in the Kyrgyz Republic is on the development of its Tulkubash heap leach project. An extensive drilling programme and feasibility studies carried out over many years have revealed a rich deposit of high-grade ore in the Tulkubash, Contact and Main zones of the deposit.

Discovery costs per ounce and ounces discovered per metre drilled are very encouraging and continue to validate the belief that Tulkubash will continue to grow into a world-class gold deposit and is the beginning of an emerging new gold district.

Construction is ongoing at Tulkubash and the first gold production remains on schedule for 2021. The Company continues to advance detailed engineering and has finalised several project components for immediate construction readiness.

In March 2019, Chaarat signed a term sheet to enter into a Joint Venture with Çiftay İnsaat Tahhüt ve Ticaret A.S., the Turkish mining and mine construction contractor, to collaborate on the Tulkubash and Kyzyltash projects.

Çiftay has extensive experience as a mining and civil engineering contractor at multiple mine sites in Turkey including two major gold mines.

Under the agreement, based on an agreed valuation of US$252 million (post money) for the two assets, Çiftay will progressively invest US$31 million for a 12.5% equity stake in Tulkubash and Kyzyltash.

Çiftay’s investment provides a significant amount of the required equity for the Tulkubash project. Total capital expenditure for the project is between US$120 and $130 million.

Ciftay, a partner since 2017, has been appointed as a construction and long-term mining contractor for the Tulkubash project. Çiftay has commenced earthworks, negotiated at arms-length rates, which represent an improvement to the terms indicated in the 2018 Feasibility Study.

Ownership100%Measured & Indicated Resources1,624 koz contained gold; 42 MT at 1.2 g/t
Anticipated Start DateQ1 2020Production95 koz / year
Extraction ProcessOpen pit, contract mining, heap leach, 2.9mtpa processing capacityLife of Mine4 years @ 200-300koz/ year

The Tulkubash orebody is suitable for open pit mining and low-cost heap leach extraction – a low capital, low operating cost, technically straightforward solution. The project is expected to have an initial processing capacity of 95koz per year but is being designed to be expandable to 120koz+ per year with low incremental capital once exploration has been completed.

Exploration up to January 2019 has defined 1,657,000 ounces of gold through approximately 78,000m of drilling. This is contained within a 3.2km of strike in the southern portion of Chaarat’s 6km long mining licence. Drilling in 2018 confirmed that mineralisation was continuous along strike, extending the proposed open pit to include previously identified along-strike satellite deposits. A substantial drilling programme is planned for 2019 to further extend the Tulkubash mineralisation.

Oxide ore will be crushed at the processing plant to 12.5mm and stacked directly on the heap leach pad. Through a simple chemical process gold will be extracted from the zero-discharge heap leach pad into a solution, passed through carbon columns to extract the gold, from where it will be further refined at site through elution, electro-winning and smelting, to deliver a doré bar of gold and silver with minor impurities. Overall gold recovery is expected to be 70%.

Heap Leach Basic Design schematic